An Interior Renovation for a 41,000 SF Office.
West Falls at Falcons Landing has the goal of managing power sources efficiently. The project called for multiple redundant power sources, ranging from backup generators for extended outages to UPS systems for shorter outages. For ten years, Nova Electrical has collaborated on projects of this nature. Nova Electrical built one hundred fifty backup generators at West Falls at Falcons Landing after serving numerous projects with comparable needs. For the latter three buildings’ associated power supply requirements, Nova Electrical completed them. Each project was finished within the allotted 16-week construction period.
2750kva utility 20 transformers
3250KW Generators 20 And Enclosures
4000A Distribution 20 Switchboards
1MW UPS Modules &40 240 Battery Cabinets