Project Consists of Interior only, Non- Structural Fitout For Tenant Office Space.
Nova Electrical started a significant three-year project that involved replacing electrical and mechanical systems to strengthen the building management system’s dependability and energy efficiency. Nova Electrical built ten new air handling units, and the chilled water plant, the steam boiler plant, and the hot and chilled water distribution systems were all replaced. We also installed conduits and cabling throughout the facility. We changed temperature sensors with sensors compatible with the new building management system to provide the required communications infrastructure for roughly 1,600 air terminal boxes. The new communications system and supply boxes feed air to each room, and the BMS also contains new differential pressure controllers and terminal box controllers.
2750kva utility 20 transformers
3250KW Generators 20 And Enclosures
4000A Distribution 20 Switchboards
1MW UPS Modules &40 240 Battery Cabinets