For Microsoft Reston Engineering Phase 1&2 SCIFF, Nova Electrical upgraded the interior power infrastructure by installing new branch power panels for lighting, outlets, mechanical equipment, and other electrical equipment. Additionally, the project required the installation of over 40 various types of lighting fixtures compatible with a Lutron Controls System. The improved lighting was intended to highlight the décor and evoke a comfortable, homey feeling. The ability to alter the scenes in each space gives hotel workers freedom. To further assure the safety of the personnel and visitors, the current fire alarm program was updated and expanded in the remodeled rooms.
2750kva utility 20 transformers
3250KW Generators 20 And Enclosures
4000A Distribution 20 Switchboards
1MW UPS Modules &40 240 Battery Cabinets
800A Static Transfer Switches
Miles Of 3-1/2” &4” Emt Conduit
Miles Of 4” &8” Pvc Conduit
800A Power Distribution Units