A Renovation of Catholic University-
Design Was the main difficulty Nova Electrical encountered at Catholic University O’Connell. By thinking vertically, Nova Electrical could double the chiller’s capacity, put necessary equipment into a small space, integrate it with existing electrical systems, and ensure there was never a power outage during the nine-month project. Nova Electrical also recommended that the organization modify its initial plans to boost its chillers’ capacity. The customer could fit more accommodation in a smaller location by installing four 500-ton chillers, which was a critical factor in this project as the original plan called for 1,500 tons of extra chiller capacity.
2750kva utility 20 transformers
3250KW Generators 20 And Enclosures
4000A Distribution 20 Switchboards
1MW UPS Modules &40 240 Battery Cabinets